Once a Permit has been approved and it is within the time frame of the Permit, you can manually select when work starts and when work finishes.
The point of contact for the Permit will also be notified (by email and/or sms) at the start and finish times of the Permit to remind them to sign in and out of the Permit.
Instructions
To Start Work:
- Log into HammerTech
- Select your required project from the Company Overview drop-down in the top right hand corner
- Select PERMITS > View All
- Select the green > Start Work icon for the Permit you wish to Start Work for
- A screen will appear with the details of the Permit, confirm that the details are correct and sign and print your name in the spaces provided
- Select the Blue Start Work icon at the bottom of the page
To Stop Work:
- Log into HammerTech
- Select your required project from the Company Overview drop-down in the top right hand corner
- Select PERMITS > View All
- Select the Orange > Stop Work icon for the Permit you wish to Stop Work
- A screen will appear with the details of the Permit, confirm that the details are correct and sign and print your name in the spaces provided
- Select the Blue Finish Work icon at the bottom