The HammerTech Meetings function allows two distinct types of meetings:
- Main Contractor Led or;
- Employer Led
Where it is a Main Contractor Meeting, it is expected that a Safety Manager user would be the person conducting the tool box meeting, whilst Subcontractor foreman may be required to log whom attended, capture their signatures, and for it to aggregate for the Safety Manager to close out.
The other type is Employer Led which creates a meeting under each employer selected, where the Employer will run the meeting and capture details of whom attended.