JHA > Configure The Review Period For High Risk JHAs

  • Log into HammerTech (if you are not already logged in), then navigate to the project you are working on and go to the left panel > Project Settings > High Risk JHA Review.
  • By setting a Review Interval, all JHAs checked as High Risk will periodically flag as requiring review according to the chosen period.
  • Note: the Review Interval is set at a project level and will only apply to all High Risk JHAs within that particular project.
  • Select > Save Changes

 