Instructions
To configure Inspection KPIs
- Log into HammerTech
- Select your required project from the Company Overview drop-down in the top right hand corner
- Select Administration > KPIs
- View any currently configured Inspection KPIs from the list
- To add a new KPI, select blue + symbol in the top right corner
- Select the Inspection Type from the drop-down
- Enter the Quantity of Inspections that are expected during the Interval
- Enter the Interval number, select the Interval time period from the drop-down
- Select if the time period Is Rolling or select a start date from the Calendar
- Once completed, select Create
Note: Results from the configured Inspection KPIs can be viewed using the Inspections KPIs Dashboard